MELET ENERGY ORDU REGULATOR AND HYDRO-ELECTRIC POWER PLANT


Location          : Ordu Kabadüz
 
Locality            : Melet River
 
Water Intake Hide        : 125 m
 
Tail Water Hide            : 35 m
 
Water Intake Structure            : 2 units of regulator
 
Energy Transmission Line       : 7 km 154 kw
 
Penstock Pipe  : 580 mm inclined tunnel and 100 m steel pipe
 
Transmission Line       : 10.158 m Ø580 mm tunnel
 
Head    : 95 m
 
Installed capacity        : 42 MW
 
Generation      : 156.000.000 kwh/year