İSTANBUL-ŞİLE-AĞVA HIGHWAY

1_KAPAK-RESMI-sile-agva-670X350.jpg

Being constructed between İstanbul-Şile-Ağva Km: 16+500- 26+950 and Km: 37+000-84+800, the project includes the construction of a highway with a length of 58.25 km and 3 lane in both directions.

The project scope consists of 6870 m viaduct, 5970 m NATM tunnel, 15 ea. bridge crossing, earthworks, engineering structures and bituminous surface treatment works.