TAVUKÇU RIVER BED REHABILITATION


Scope of the project; 2,250 m of river bed improvement with prefabricated segments, bridge construction, 11,550 m of waste water and storm water canal, road superstructure works and landscaping works in the zone of Tavukçu river bed, which is located between Highway E5 and Sea of Marmara.